Today I started the pedestal base and it is now ready for 3 coats of varnish. I cut and fit all of joinery and sanded all of the parts to 400p. I decided to make a few slight changes to the legs as well as the apron. The original design had a very simple tapered […]
Archive for September 2010
stand ready for finish
September 28, 2010Dry fit, ready for pre-finishing.
September 25, 2010This morning I finished up the fit of the sliding dovetails and assembled the main carcass to check the dry fit. After the air cleaner has run for a few hours and the shop is fairly dust free, I will begin pre-finishing the interior surfaces of the panels. I chose to adjust the spacing on […]