As of June 28th 2010, two mesquite hall tables are nearly complete. Today, in this very workshop, the bases were sanded, assembled, pegged with walnut pins and finished with a single coat of oil. Tomorrow, the bread board tops will be built and turquoise will be inlaid into the cracks. If all goes according to […]